Shipping solar panels

Solar modules are glass laminates on a pallet. They are heavier than they look, taller than people expect, and the damage that matters most is the kind you cannot see on the dock.

The damage you cannot see

A module can arrive with no visible mark and still be worth nothing. Microcracks in the cells come from shock and flex in transit, they do not show up in a visual inspection, and they turn up later as a module that underperforms for the rest of its life.

That is why handling matters more here than with most freight. Fewer touches, securement that holds the pallet square, and a driver who is not asked to improvise at the delivery end.

Pallets, stacking and weight

Modules usually ship vertically in a rack or horizontally in a crate, and the manufacturer's packaging is engineered for one of those. A pallet of full-size modules runs well over a thousand pounds and stands tall enough to change what equipment can take it.

Do not assume a pallet is stackable. Most module pallets are not, and declaring them as stackable to save money is how a load arrives crushed. If the packaging says single stack, we book it as single stack.

The delivery end is usually a job site

Residential and commercial solar deliveries rarely go to a dock. They go to a driveway, a yard, a rooftop staging area or a field with a gate. That means liftgate, and it means knowing in advance whether anything on site can lift a pallet off the truck.

If there is a forklift or telehandler on site and someone qualified to run it, say so, because it changes both the equipment and the rate. If there is not, the truck has to bring the capability with it.

Racking, inverters and balance of system

Mounting rails, ballast, clamps, combiner boxes and inverters often move alongside the modules or just ahead of them. Rails are long and awkward and sometimes need open deck. Inverters are heavy for their size and dislike being dropped.

Sequencing matters on a build. Racking before modules is the usual order, and a delivery that arrives in the wrong sequence leaves a crew standing around.

What we need to quote a solar load

Module count alone is not enough. These are what decide the equipment.

  • Pallet count, and the height and weight of each pallet
  • Whether the pallets are stackable, per the manufacturer packaging
  • Modules only, or racking and inverters as well
  • Delivery site type: dock, yard, driveway, rooftop staging or open ground
  • Whether a forklift or telehandler is available on site, with an operator
  • Delivery date, and whether it has to follow or precede another delivery

Send us the load

Tell us what it is and where it has to go. If something else suits it better, we will say so.